Travel news for Chelsea match
Please be aware there is engineering work on the Brighton/Lewes to London line, meaning buses will replace trains up to Three Bridges.
Three Bridges and Brighton will be linked by four non-stop bus services per hour, and four all stations buses per hour in both directions. There will be a slightly reduced service in the early morning and late evening. Each departure will be served by multiple buses.
The buses will be slower than the normal train service so please allow extra time for travel!
Leave a Reply